What is it and when is it mandatory?
The Ordinary Plenary Session of Sant Josep de sa Talaia Town Council has approved the municipal ordinance regulating the obligation to submit the Building Assessment Report (IEE). This regulation affects numerous properties in the municipality, especially those of a certain age.
In this article, we explain what the IEE is, who is obliged to submit it, and what it implies for owners.
What is the Building Assessment Report?
The IEE is a mandatory technical document that certifies:
- The state of conservation of the building
- The basic accessibility conditions
- The energy efficiency certificate
This report replaces the former Technical Building Inspection (ITE) and extends its scope, incorporating criteria for sustainability, accessibility, and technical control of the existing building stock.
Its objective is to ensure that buildings are maintained in adequate conditions of safety, habitability, and appearance, while also promoting a culture of preventive maintenance.
Which buildings are obliged to submit the IEE?
According to the municipal ordinance:
- Buildings over 30 years old must submit the report regarding their state of conservation.
- Regarding accessibility and energy efficiency, the obligation affects buildings over 50 years old.
- The report must be renewed every 10 years.
Small constructions such as minor warehouses, porches, or auxiliary buildings not linked to a main construction are excluded.
The age is determined according to Cadastre data, unless another date can be proven with valid documentation.
Who is responsible for submitting it?
The obligation falls to:
- Individual owners
- Homeowners’ associations
- Legal entities owning the property
In certain cases, the tenant or usufructuary may submit it subsidiarily if the owner fails to fulfil their duty.
What happens if the result is unfavourable?
The report can be:
Favourable
If the building meets the required conditions and does not require intervention.
Unfavourable
If it presents deficiencies in safety, habitability, or conservation.
In an unfavourable case:
- There is an obligation to carry out the necessary works.
- There is a maximum period of 6 months to initiate the procedures for a licence or prior communication.
- Once the works have been completed, a final favourable conclusion must be submitted to certify compliance with the duty of conservation.
If there is an imminent danger, immediate safety measures must be adopted (shoring, removal of loose elements, etc.).
What happens if the IEE is not submitted?
Failure to submit is considered a minor urban planning infringement, with penalties ranging from €600 to €3,000.
Furthermore, the Town Council may:
- Initiate sanctioning proceedings
- Impose coercive fines
- Execute the works subsidiarily at the owner’s expense
Non-compliance is considered a continuous infringement as long as the situation is not regularised.
Why is the IEE important beyond the legal obligation?
Beyond regulatory compliance, the IEE allows for:
- Early detection of defects
- Reduction of future repair costs
- Increased building safety
- Improved energy efficiency
- Revaluation of the property
- Greater legal certainty in sales
Preventive maintenance is always more efficient than urgent intervention.
Do you need to carry out an IEE?
At Alioli Design, we prepare the Building Assessment Report, manage its processing, and, if necessary, develop the project and supervise the works resulting from the report.
If your building is over 30 or 50 years old and you are unsure if you are obliged to submit it, we can advise you.
Contact us and we will review your case.